Short Plug Repair Welding
Holland’s short plug flash-butt welding provides railways with a higher quality and more cost-effective defect remediation and repair. Traditionally, repair welding gangs rely on a 20’-40’ plug with three pieces of equipment as well as six to eight railroad employees and two Holland employees. With our short plug flash-butt repair welding gang, 5’ plugs are used with two pieces of equipment and a total of four (railroad and Holland) employees.
The benefits of short plug flash-butt welding:
- A single four-man crew can match the efficiency of three thermite crews
- Superior joint strength and durability compared to thermite
- Typical repair takes between 60-75 minutes
- Using 5’ plugs out of a 40’ or 20’ rail, there is no scrap
- A small gang is more nimble than a large repair gang
Along with these benefits, Holland’s flash-butt welding services include our Intelliweld® Control System which provides superior control over the flash-butt welding process.
Learn more about the benefits of Holland Flash-Butt Welding versus Thermite Welding.